My Email
Search 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
You are here :: HOME : SECTORS OF OPERATION : RAILAWAY ELECTRIFICATION
    

RAILWAY ELECTRIFICATION

Business Profile & Services

RITES render specialised consultancy services for design, execution and project management services covering entire spectrum of Railway electrification covering following broad areas :

RES Img

  • Detailed survey of the Railway section for the purpose of Railway Electrification.
  • Feasibility Study for Railway Electrification of Railway Track
  • Detail Project Report (DPR) and Tender Documents for the Railway Electrification of Railway Track.
  • Technical services for tender evaluation or furnishing technical clarifications as desired by client.
  • Project Management Consultancy for construction supervision of Railway Electrification project
  • Detailed design of Overhead contact system and traction power supply for Railway Electrification.
  • Turnkey execution of Railway electrification projects (On Deposit work basis)

Contact Information 

Group General Manager(Elect)-SBU Head, Bimal Prasad, email id:- bimalprasad@rites.com,Tel:-0124-2574001
Group General Manager(Elect)(TRD), Ashok Kumar Kapoor,email id :-  ashokkapoor@rites.com,Tel:-0124-2577644
Group General Manager(Elect), R. K. Mehta, email id :-  rkmehta@rites.com ,

Important Projects (Domestic-Ongoing ) 

 (A) Detail Project Report, Tender Document and Project Management Consultancy services 

  1. Survey, preparation of Detail Project Report, Tender Document and Project Management Consultancy for Railway Electrification of 46.5 Track Kilometres of Railway siding.

                    Client: Steel Authority of India Limited                Location: Bhillai 

  1. Survey, preparation of Detail Project Report, Tender Document and Project Management Consultancy for Railway Electrification of 70 Track Kilometres of Railway siding including construction of 1 No. 132KV/25KV Traction Substation.

                      Client: Tata Steel Plant                     Location: Kalinganagar 

  1. Survey, preparation of Detail Project Report, Tender Document and Project Management Consultancy for Railway Electrification of 14 Track Kilometres of Railway siding including construction of switching post and supply of 4 wheeler tower wagon. 

                     Client: Rashtriya Ispat Nigam Limited                  Location: Vishakapatnam 

(B) Project Management Consultancy services (PMC) 

Project Management Consultancy for Railway Electrification of 83 Track Kilometres of Railway siding including construction of 1 No. 132KV/25KV Traction Substation and 4 Nos. Switching posts. 

                     Client: Steel Authority of India Limited                     Location: Rourkela 

 (C) Turn Key Basis

 Survey, Design, construction, installation and commissioning of Railway Electrification of 3.8 TKM including modification of existing OHE. It is a deposit work. 

                     Client: Steel Authority of India Limited and RMD (Joint venture)              Location: Bolani 

(D) Design Consultancy 

  1. Detailed engineering consultancy for Railway Electrification of 80 TKM Railway Track for the provision of 5th and 6th line on Central Railway from CSTM to Kurla. The work includes design of 3 Nos. Railway Traction substations and 5 Nos. switching posts. 

                      Client: Mumbai Rail Vikas Nigam Limited.                     Location: Mumbai 

  1. Detailed engineering consultancy for Railway Electrification of 150 TKM Railway Track for the provision of 5th and 6th line on western Railway from Mumbai Central to Borivili and Thane to Diva. The work includes design of 3 Nos. Railway Traction substations and 6 Nos. switching posts.

                      Client: Mumbai Rail Vikas Nigam Limited. 

(E) Preliminary traffic cum Engineering Survey (PET) 

Preliminary traffic cum Engineering Survey for the construction of Dedicated Railway Freight corridors that includeds 2X25 KV Railway Electrification. The study is carried out in 4 nos. New corridors (1) North-South 2173 KM (Delhi-Chennai) (2) East-West Corridor 2000 KM (Kolkatta-Mumbai) (3) East Coast Corridor 1100 KM ( Khargpur-Vijaywada) (4) Southern Corridor 890 KM (Chennai-Goa)

 Important Projects (Domestic-Completed) 

  (A) Detailed Survey 

  RITES carried our Detailed survey and preparation of OHE pegging plan for  the Railway Electrification of 15000 TKM existing Railway Track. 

             Client: Indian Railways.             Location: All over India

    (B) Detail Project Report, Tender Document 

Survey, preparation of Detail Project Report and Tender Document for Railway Electrification of 83 Track Kilometres of Railway siding including       construction of 4 Nos. of Switching posts. 

                   Client: Steel authority of India Limited                   Location: Rourkela 

 (C) Detail Project Report, Tender Document and Project Management Consultancy services 

  1. Survey, preparation of Detail Project report, Tender Document and Project Management Consultancy for Railway Electrification of 95 Track Kilometres of Railway siding. 

                  Client: M/s L&T and Grasim                  Location: Grasim and Hirmi 

  1. Preparation of DPR, Tender Document and Project Management Consultancy for Railway Electrification of 19 Track Kilometres of Railway siding. 

                  Client: National Thermal Power Coprporation                 Location: Dadri 

  1. Survey, preparation of Detail Project Report, Tender Document and Project Management Consultancy for Railway Electrification of 12 Track Kilometres doubling of existing Railway siding. 

                   Client: National Thermal Power Coprporation                   Location: Dadri 

 (D) Preliminary traffic cum Engineering Survey 

Preliminary traffic cum Engineering Survey for the construction of 3247 KM Dedicated Railway Freight corridors that includes 2X25 KV Railway Electrification. The study was carried out in 2 nos. corridors (1) Eastern Corridor 1232 KM  (Ludiana to Sonnagar), 522 KM (Sonnagar-Dankuni) (2) Western Corridor 1493 KM (Dadri-JNPT) 

                  Client: Dedicated Freight Corridor of India Limited                Location: Ludiana to Dankuni: Dadari to JNPT 

Important Projects (Overseas-Completed) 

(A) Feasibility Study 

  1. Feasibility study for laying 1317 KM new Railway track including 25 KV Railway Electrification from Mechi-Mahakali and Kathmandu-Pokhara in Nepal. 

                    Client: Ministry of Physical planning of work.                   Location: Kathmandu, Nepal 

  1. Feasibility study for laying 650 KM new Railway track including 25 KV Railway Electrification from Mekeile to Tadjourah in Ethopia. 

                    Client: Ethopian Railway Corporation.                    Location: Mekeile to Tadjourah 

(B) Detail Project report 

Preparation of Detailed project Report for laying 216 KMs new Railway track including 25 KV Railway Electrification from Assaita to Tadjourah in Ethopia. 

                  Client: Ethopian Railway Corporation.                  Location: Assaita to Tadjourah 

 
Sitemap | Feedback | FAQs | Complaints | Inspection Portal | Important links | Expert/Agency Registration